{ "snippet": "", "summary": "", "accessInformation": "", "thumbnail": "", "maxScale": "NaN", "typeKeywords": [], "description": "FEMA FIRM CLOMR (Conditional Letter of Map Revision) based on the 2010 Revised DFIRM maps. FEMA's approval of a proposed project that would, upon construction, affect the characteristics of a flooding source and thus result in modification to BFE's, WCEs, or SFHAs. A CLOMR does not revise an effective FIRM; it indicates whether the project, if built as proposed, would be recognized by FEMA (a LOMR, which revises the FIRM, typically follows a CLOMR). This is a big deal process.", "licenseInfo": "", "catalogPath": "", "title": "FIRM CLOMR", "type": "", "url": "", "tags": [], "culture": "en-US", "portalUrl": "", "name": "", "guid": "", "minScale": "NaN", "spatialReference": "" }